PDF Print Set : $845.00 |
A non-modifiable, print only PDF file |
5 Copy and PDF Set : $945.00 |
5 printed plan sets mailed to you plus PDF plan sets are best for fast electronic delivery and inexpensive local printing. |
Eight Copy and PDF Set : $1045.00 |
8 printed plan sets mailed to you plus PDF plan sets are best for fast electronic delivery and inexpensive local printing. |
PDF Master Set : $1660.00 |
An unlocked, modifiable PDF file |
CAD Set : $1845.00 |
For use by design professionals to make substantial changes to your house plan and inexpensive local printing. |
Master Builder Package : $2045.00 |
Includes CAD Set, PDF Masters and Unlimited Build License |
Single Set : $610.00 |
One printed set for bidding purposes only. Not a legal building set for construction. |
Crawlspace: $0.00 |
Ideal for semi-sloped or level lot, home can be built off of grade, typically 18” - 48”. |
Slab: $175.00 |
Ideal for level lot, single layer concrete poured directly on grade. |
Basement: $250.00 |
Ideal for level lot, lower level of home partially or fully underground. |
Right-Reading Reverse : $150.00 |
Choose this option to reverse your plans and to have the text and dimensions readable. |
Additional Construction Sets : $50.00 |
Additional hard copies of the plan (can be ordered at the time of purchase and within 90 days of the purchase date). |
Additional Use License : $610.00 |
Additional Use License. |
Audio Video Design : $100.00 |
Receive an overlay sheet with suggested placement of audio and video components. |
Construction Guide : $39.00 |
Educate yourself about basic building ideas with these four detailed diagrams that discuss electrical, plumbing, mechanical, and structural topics. |
Lighting Design : $100.00 |
Receive an overlay sheet with suggested placement of lighting fixtures. |
Material List : $75.00 |
A list of building supplies needed to construct the infrastructure of your new house for the standard plan. Please note materials list will not reflect optional add-ons such as foundation and framing. |
*Alternate Foundations may take time to prepare.
*Options with a fee may take time to prepare. Please call to confirm.